Motorway kallar Kahar Salt range- M 2 from in cum Watch Video

Preview(s):

Play Video:
(Note: The default playback of the video is HD VERSION. If your browser is buffering the video slowly, please play the REGULAR MP4 VERSION or Open The Video below for better experience. Thank you!)
⏲ Duration: 9:2
👁 View: 20K times
✓ Published: 20-Apr-2024
Open HD Video
Open MP4 Video
Download HD Video
Download MP4 Video
Description:
The M-2 Motorway or the Lahore–Islamabad Motorway is a north–south motorway in Pakistan, connecting Rawalpindi/Islamabad to Lahore, and is the first motorway to have been built in South Asia. The M-2 is 375 km long and located entirely in Punjab. It continues on to eventually become the M-1 motorway, which terminates in Peshawar. The M-2 crosses the junction of M-4 (to Faisalabad) at Pindi Bhattian and M-3 (to Multan) at Dera Saithan Wala. The motorway is also a part of the Asian Highway AH1. The motorway was constructed during Prime Minister Nawaz Sharif's rule and cost over Rs. 60 billion (equivalent to US$2.8 billion in 2023) and was opened in November 1997. One of the most expensive motorways in Asia, it also has one of the highest pillared-bridges in Asia at the Khewra Salt Range section.<br/><br/>There are ten service and rest areas on both sides of the motorway, with fueling, car wash, and car-repair facilities, and fast-food restaurants such as KFC, McDonald's, and Gloria Jean's Coffees, among others.<br/><br/>In 2016, the entire motorway was resurfaced—work that stretched over several months. New toll plazas were installed on every interchange. They are payable with a new M-tag system that was introduced in December 2021.<br/>The M-2 was conceived by Prime Minister Nawaz Sharif in his first term (1990–1993). The contract was awarded to Daewoo Group of South Korea on 30 December 1991 at a cost of Rs. 23,686 billion on a design-cum-construct basis. The original contract was for a four-lane facility.<br/><br/>Daewoo provided a loan of $379 million as supplier's credit, covering 40% of the construction cost. The loaned amount would eventually grow to $702 million. The other 60% of the cost would be paid by the government.<br/><br/>The motorway was inaugurated on November 26, 1997, during Sharif's second term.In late 2006, upgrades were made to the portion of the M-2 passing through the Salt Range due to increasing complaints of drivers. The upgrades included better marking of the road lines and increased size of road signs for easy visibility.In 2016, the M-2 motorway was resurfaced for a smooth and safer drive.

Share with your friends:

Whatsapp | Viber | Telegram | Line | SMS
Email | Twitter | Reddit | Tumblr | Pinterest

Related Videos

The M-2 Motorway or the Lahore–Islamabad Motorway is a north–south motorway in Pakistan, connecting Rawalpindi/Islamabad to Lahore, and is the first motorway to have been built in South Asia. The M-2 is 375 km long and located entirely in Punjab. It continues on to eventually become the M-1 motorway, which terminates in Peshawar. The M-2 crosses the junction of M-4 (to Faisalabad) at Pindi Bhattian and M-3 (to Multan) at Dera Saithan Wala. The motorway is also a part of the Asian Highway AH1. The motorway was constructed during Prime Minister Nawaz Sharif&#39;s rule and cost over Rs. 60 billion (equivalent to US&#36;2.8 billion in 2023) and was opened in November 1997. One of the most expensive motorways in Asia, it also has one of the highest pillared-bridges in Asia at the Khewra Salt Range section.&#60;br/&#62;&#60;br/&#62;There are ten service and rest areas on both sides of the motorway, with fueling, car wash, and car-repair facilities, and fast-food restaurants such as KFC, McDonald&#39;s, and Gloria Jean&#39;s Coffees, among others.&#60;br/&#62;&#60;br/&#62;In 2016, the entire motorway was resurfaced—work that stretched over several months. New toll plazas were installed on every interchange. They are payable with a new M-tag system that was introduced in December 2021.&#60;br/&#62;The M-2 was conceived by Prime Minister Nawaz Sharif in his first term (1990–1993). The contract was awarded to Daewoo Group of South Korea on 30 December 1991 at a cost of Rs. 23,686 billion on a design-cum-construct basis. The original contract was for a four-lane facility.&#60;br/&#62;&#60;br/&#62;Daewoo provided a loan of &#36;379 million as supplier&#39;s credit, covering 40% of the construction cost. The loaned amount would eventually grow to &#36;702 million. The other 60% of the cost would be paid by the government.&#60;br/&#62;&#60;br/&#62;The motorway was inaugurated on November 26, 1997, during Sharif&#39;s second term.In late 2006, upgrades were made to the portion of the M-2 passing through the Salt Range due to increasing complaints of drivers. The upgrades included better marking of the road lines and increased size of road signs for easy visibility.In 2016, the M-2 motorway was resurfaced for a smooth and safer drive.
⏲ 9:2 👁 20K
IPPF
⏲ 1 minute 4 seconds 👁 153.9K
Alex Grendi
⏲ 7 minutes 50 seconds 👁 25.9K
didzit
⏲ 5 minutes 5 seconds 👁 220.3K
Ask Doctor T
⏲ 7 minutes 18 seconds 👁 273.6K
The Brazilian Gardener
⏲ 31 seconds 👁 127.5K
Tink
⏲ 3 minutes 51 seconds 👁 239.7K
Alex Grendi
⏲ 6 minutes 24 seconds 👁 57.1K
bisounours666
⏲ 6 minutes 20 seconds 👁 2M

Related Video Searches

Back to Search

«Back to in cum Videos

Search in cum Desi Porn
Search in cum MMS Porn
Search in cum XXX Videos
Search in cum HD Videos
Search in cum XXX Posts
Search in cum Photos
Search in cum Leaks
Search in cum Web Series
Search in cum Pics
Search in cum VIP XXX

Search Videos

Recent Searches

lety does stuff naked photo leaks nudostar 4 | 8008幸福宝官网隐藏入口破解♛㍧☑【免费版jusege9 com】☦️㋇☓•nn8w | toxiicviirgo | andra aunty hot sex mmsat xxx sexy aunts | 丹巴高仿身份证⏩办理网zhengjian shop⏪ | haryana ke bache | 淘宝上可以花钱人肉信息吗tguw567全国调查信息记录均可查 eri | www xxx co an auntyx vibeo rrrff@xxxhhg@ftruiyu | english sexy bhabhi video hd video | pak teen nude selfie | ag亚游一般取款⅕⅘☞tg@ehseo6☚⅕⅘•j69o | kannada rammy sexndian sex | gz6led51kue | 上海金山区哪里有品茶推荐(v电➡️17155201234)【沪上老李】上海最靠谱的外围模特经纪wcustf | chees kalam | 9527nb com👇谷歌关键词排名下降是什么原因呢怎么办⛔黑帽seo培训⛔小旋风蜘蛛池⛔谷歌蜘蛛池搭建推广⛔搜索留痕软件⛔搜索留痕培训教学技术代做⛔谷歌关键词排名下降是什么原因呢怎么办⛔wl7134131emklmnds | auto shankar movie | xxx breast antes | 建阳如何买催情药➕网站:mw08 cc➕出售迷药正品发货诚信第一dha | 新加坡后港怎么找小姐全套叫包夜服务123选妹网址m145 com真实上门服务125新加坡后港怎么找小姐特殊服务▷新加坡后港找小姐大保健按摩特殊服务▷新加坡后港找小姐学生妹过夜上门按摩服务 jnv | 沈阳哪里能高仿身份证☀️办理网bzw987 com☀️ 沈阳哪里能高仿身份证5q🔵办证网bzw987 com🔵 临河沈阳哪里能高仿身份证 哪里办沈阳哪里能高仿身份证kn | 满城春色入洛阳诗句⅕⅘☞tg@ehseo6☚⅕⅘•goo3 | www a to z bad wap com | سكس نيك بنات ايرانيات | nsao1i0nhkm | 谷歌搜索引流【电报e10838】google排名收录 eyp 0517 | 上海新虹桥国家会展中心灿辉希尔顿花园酒店如何才能找到出来卖的学生(v电➡️17155201234)【沪上老李】上海最靠谱的外围模特经纪ur9uyd | 杭州南站哪有休闲会所一条龙全套上门(v电✅16511000789老李✅)【快速安排】最靠谱的外围模特经纪qwye | www xxx video fucking inanty sex vetioy and hoes xxx | dana taranova fap | happy 2024 |
<